A bathroom is a small room where the details are unforgiving and the stakes behind the walls are high. Tile that is out of plane shows instantly, and waterproofing that was rushed turns into rot and mold a few years later. In the wet Northwest, the part you cannot see matters as much as the part you can.
SCR remodels bathrooms across Snohomish, King, and Skagit Counties with proper waterproofing, clean tile work, and cabinetry built to a finish standard. We treat the substrate, the pan, and the membrane as seriously as the finishes, because a beautiful bathroom that leaks is a failed bathroom.
From a dated hall bath to a spa-like primary suite with a curbless walk-in shower, we plan the whole project up front and build it to last.
Get a free estimate →Proper pans, membranes, and backer, installed the way they should be so the finish work stays sound for the long haul in our climate.
Tile set in plane with tight, consistent grout lines and thought-out layouts, not started in a corner and left to run out awkwardly at the wall.
Vanities, linen built-ins, and medicine cabinetry built and fit to the room rather than forced from a stock size.
Curbless showers, grab-bar blocking, comfort-height fixtures, and aging-in-place details when you want a bathroom that works for the long term.
From a single hall bath to a full primary suite, the work can include:
We settle layout, fixtures, tile, and budget before demo. In a bathroom, the plumbing locations and the shower design drive everything, so we get those decided and drawn first.
We take it back to sound substrate, update the plumbing and electrical, and build the waterproofing properly. This is the step rushed by the crews whose work fails in five years. We do not rush it.
Tile set true and in plane, vanities and built-ins fit tight to the walls. The finish-carpentry standard is what makes a small room feel considered.
Fixtures, glass, hardware, and the clean final details. Everything checked level, sealed, and functioning before we call it done.
It varies with size, scope, and finishes, and a hall bath refresh is a very different number from a gutted primary suite with a custom curbless shower. We give you a clear, itemized estimate for your specific bathroom so you can make choices with real numbers.
The answer is in the parts you never see. Proper shower pans, a continuous waterproof membrane, the right backer board, good ventilation, and correct slope to the drain. We build the waterproofing assembly correctly and do not cover it until it is right. That is what keeps our climate out of your walls.
Yes. Curbless and low-threshold walk-in showers are popular for both the look and for accessibility, and they require careful framing and waterproofing to get the slope and drainage right. It is exactly the kind of detail we handle well.
Yes, and older homes often have surprises behind the walls, from old plumbing to hidden rot. Because we also do rot and structural repair, we fix what we find at the source and rebuild it properly as part of the remodel rather than tiling over a problem.
A typical bathroom runs a few weeks of active work once permits and materials are in hand. Tile and waterproofing have cure times that cannot be rushed, which we build into a realistic timeline up front.
SCR Construction NW serves homeowners across Snohomish, King & Skagit Counties. From the first emergency call to the final coat of finish.
Bring us your ideas or your plans and let's talk through what your home could become. Free estimates, no pressure.